Construction quality control and inspection expert witness773-619-1226 | paul@expertwitness.co

QC Practices, Checks and Deficiencies

Construction Quality Control Expert

A construction quality control expert evaluates the checks a contractor performs on its own work: reviewing documents before work starts, inspecting at hold points before work is covered, verifying products and tracking deficiencies to correction. Paul Gaston compares the quality control that was required with what was actually performed and recorded, and explains the effect on the work.

Two construction workers in hard hats and high-visibility vests comparing notes on tablets in front of scaffolding

Quality Control Is the Contractor's Own Checking

Quality control, often shortened to QC, refers to the checks the party performing the work carries out to make sure the work conforms to the requirements. On most projects that is the general contractor and its subcontractors. Quality control is distinct from quality assurance, which is oversight by others, such as the owner or its representatives. Both matter, but under most contracts the contractor remains responsible for the conformance of its own work regardless of what others inspect.

A Typical Quality Control Workflow

  1. Document reviewDrawings, specifications and approved submittals are reviewed before the work starts, and conflicts are raised through RFIs.
  2. Pre-installation checkSubstrate, materials and conditions are verified before installation begins.
  3. In-progress inspectionThe first installations are checked to confirm the method before the work is repeated.
  4. Hold point inspectionWork is inspected before it is covered by the next layer or trade.
  5. Deficiency recordingNonconforming work is logged with location, description and responsible party.
  6. Correction and verificationDeficiencies are corrected and reinspected before the log entry is closed.
  7. Completion inspectionPunch list and close-out inspection before turnover.

Where Quality Control Requirements Come From

Some contracts require a formal quality control plan with defined inspections, forms and staffing. Others simply require the work to conform to the documents. Owner standards, specifications and manufacturer instructions can add specific checks, such as moisture testing before flooring or inspection of blocking before drywall. Recognized contractor practice includes checking work before it is covered even where the contract is silent. Paul identifies which of these applied before evaluating what was done.

Common Quality Control Failures

  • No inspection at hold points, so deficient work was covered before anyone looked at it
  • First installations not checked, allowing a wrong method to be repeated throughout
  • Products installed without verifying they matched approved submittals
  • Deficiencies observed but not recorded, or recorded but never closed
  • Corrections made to the visible symptom rather than the cause
  • Quality staff assigned on paper but not present when the work was done

Evaluating Quality Control From the Record

Paul reviews quality control plans, inspection checklists, daily reports, photographs, deficiency logs and correspondence to reconstruct what checking took place, then compares it with the work in the field. A pattern of repeated deficiencies in the same work is often the clearest sign that quality control was not functioning. See quality control documentation and corrective action and reinspection.

Questions

Common Questions

What is the difference between quality control and quality assurance?

Quality control is the performing party's own checking of its work. Quality assurance is oversight by others, such as the owner or its representatives, to confirm the quality control is working.

What is a hold point?

A stage at which work stops for inspection before it is covered or the next trade proceeds.

Is a contractor required to have a quality control plan?

It depends on the contract. Some require a formal plan; others require conforming work without specifying the method. Recognized practice includes checking work before it is covered.

Why check the first installations?

Checking the first installations confirms the method before it is repeated, which prevents the same deficiency from spreading throughout the project.

Does the dispute turn on what was inspected and recorded?

Send the party names for a conflict check. Paul will review the quality records and the work and explain what they show.